Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6260 Lubrizol to build - Coatings World
Suppliers News

Lubrizol to build

The Lubrizol Corp. is investing approximately $40 million to build a facility in Songjiang, just outside of Shanghai. The new facility will include manufacturing, commercial and technical capabilities. It will be built on approximately 31,000 square meters of land adjacent to the company’s existing Eastane TPU (thermoplastic polyurethane) plant. The company expects to begin construction in the third quarter 2007, and to complete it in the fourth quarter 2008.
Products initially slated for production at the site include resins, polymers and specialty additives used in coatings for wood, plastic, metal and textiles.

Add us as a preferred source on Google

Get the latest Coatings World news, insights and analysis in your Google Search and AI experiences.

Keep Up With Our Content. Subscribe To Coatings World Newsletters